Recent Projects

Clifton Rising Main

Clifton Rising Main

In Yo9rk, our sewerage team was contracted to replace the Clifton Rising Main, a 1.3km sewer passing through environmentally-sensitive land parallel to the River Ouse – this posed a number of challenges to our team designing and constructing the works. The site […]

Bramley Service Reservoir

Bramley Service Reservoir

MMB’s scheme at Bramley included the demolition of 2 no. existing service reservoirs in poor structural condition and the construction of a new service reservoir with twin compartments and a usable capacity of 16ML. Bramley is the largest of seven pre-cast service […]

Worksop Sewage Treatment Works

Worksop Sewage Treatment Works

Our scheme at Worksop STW involves the construction of a sludge processing facility with access roads and a canal and river crossings. Worksop is one of the three (out of nine) projects MMB is delivering as part of the e5 (efficiency […]

Cambridge Water

Cambridge Water

As part of their AMP5 framework award, MMB continue to work closely with Cambridge Water Company and other members of the supply chain to secure leakage reduction targets in the region. The MMB team are responsible for creating, developing and […]

Wheatcroft Rising Main

Wheatcroft Rising Main

Our clients in the water sector often need to respond to “emergency” situations – and rely on their contract partners for a quick, effective and safe response, whatever the situation. The unusually cold winter of 2010/11 led to numerous examples […]

Lancaster Park Road, Harrogate

An MMB scheme near Harrogate District Hospital drew high praise for the considerate nature in which it was planned, managed and delivered. The scheme, part of Yorkshire Water’s £120m investment to upgrade its sewer network and treatment facilities to reduce […]

Wastewater Mains, Bishopthorpe, York

In November 2011, MMB began work to repair two defective wastewater rising mains that run through the centre of Bishopthorpe, York, a heavily populated residential area that had been subjected to both area and residential flooding.  The team has drawn […]

Windleden Spillway

Reservoir Improvements

As the sole contract partners on Yorkshire Water’s reservoirs stream for AMP5 the MMB teams involved in delivering this work remain extremely busy, with many of the reservoir improvement works now on site. Teams continue to maximise the benefits of […]

Leek Sewage Treatment Works

Leek Sewage Treatment Works

This project, delivered as part of our AMP5 framework with Severn Trent Water, centred on the construction of a new grit treatment plant, sludge transfer pumping station and an inlet pumping station, plus additional works to the existing site infrastructure.  […]

Process Innovation

The EaWR (Electricity at Work Regulations) Scheme involves electrical testing and inspection then remedial works at 2000+ Yorkshire Water assets. To carry out this work, MMB are required to obtain a Handover Certificate from Yorkshire Water. As the works are […]